This will yield inaccurate results for places such as Yuma, AZ. The default location is set to Boston, MA, for all projects. The Project Location button is located on the EO panel, and also in the Project Information. The key to accurate energy analysis is to set the Project Location and select the closest weather station. We will examine the tools available on the Energy Optimization panel of the Analyze tab in Revit 2020. Energy Optimization (EO) requires an Autodesk subscription to access the online tools including the energy analysis dashboard called Insight360. ![]() Recently the Energy Optimization tools within Revit have been expanded. Sustainable design has become an important part of the architectural design industry. Civil Site Design & Stringer Topo Online Courses.Autodesk Vehicle Tracking Online Courses.BIM Services for Architecture and Engineering.Facility Control Systems with Bluebeam Revu. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |